← All Guides

Learn

PM Surya Ghar Subsidy Guide

Everything you need to know about India's rooftop solar subsidy scheme — in plain language.

Last updated: 9 August 2026

Subsidy amounts, timelines, and scheme rules are set by the Government of India and can change. The figures on this page reflect published PM Surya Ghar guidelines as of the date above — please verify current details on pmsuryaghar.gov.in or confirm with our team before making a decision.

What is PM Surya Ghar?

PM Surya Ghar: Muft Bijli Yojana is the Government of India's flagship scheme to help households install rooftop solar and cut their electricity bills — in many cases, down to zero.

The government pays a portion of your system cost directly as a subsidy, called Central Financial Assistance (CFA). The rest can be financed through a collateral-free loan. Solvo handles the paperwork, DISCOM coordination, and installation so you don't have to navigate the process alone.

Are you eligible?

  • You own the home (or have the owner's consent) where the system will be installed
  • You have a valid electricity connection with a distribution company (DISCOM)
  • Your roof has enough shadow-free area for the system size you need
  • The connection is residential — commercial and institutional buildings follow a separate track
  • No rooftop solar subsidy has already been claimed on this connection

Subsidy amount by system size

Subsidy (CFA) is paid at ₹30,000 per kW for the first 2 kW, and ₹18,000 per kW for the next 1 kW — capped at ₹78,000 regardless of system size beyond 3 kW.

System sizeSubsidy (CFA)
Up to 1 kW₹30,000
Up to 2 kW₹60,000
3 kW and above₹78,000 (maximum)

How the application works

01

Portal registration

Sign up on the national PM Surya Ghar portal with your consumer number and DISCOM details.

02

DISCOM approval

Your DISCOM reviews and approves technical feasibility for your address.

03

Choose your vendor

Select an empanelled installer and finalize your system design and quote.

04

Installation

Certified crew installs ALMM-listed panels and balance-of-system components.

05

Net-metering

DISCOM installs a net meter and commissions the system after inspection.

06

Subsidy disbursed

Once commissioning is confirmed, subsidy is credited via DBT to your bank account.

Documents you'll need

  • Aadhaar card (identity proof)
  • Recent electricity bill (proof of DISCOM connection)
  • Proof of home ownership, or NOC from the owner
  • Bank account details, for DBT subsidy credit
  • Passport-size photograph

Realistic timeline

Registration to DISCOM approval1–2 weeks
Vendor selection to installation2–4 weeks
Net-metering & commissioning2–4 weeks
Subsidy disbursal after commissioning4–8 weeks

Typically 2–4 months end to end — this varies significantly by state and DISCOM workload.

Where Solvo helps

  • We register your application and liaise with your DISCOM on your behalf
  • We handle the full technical documentation for feasibility approval
  • We install using only ALMM-listed, subsidy-eligible components
  • We coordinate the net-metering inspection and commissioning
  • We track your subsidy status and follow up until it's disbursed

Ready to start your application?

We'll check your eligibility, size your system, and handle the subsidy paperwork.

Get Free Site Survey